Manufacturing site based in the North West

Works carried out:  Manufacturing site based in the North West
What service related to:  Boiler Water Treatment

The Problem

The customer had a large steam boiler less than 18 months old which had already had four tubes replaced due to the chemical dosing regime not being fit for purpose.

The Solution

M & S Water Services Limited carried out a full review, installed a new fully automated dosing system and changed to a more targeted and suitable chemical package that ultimately led to a more cost effective and comprehensive water treatment programme.

The Outcome

With the implementation of the new water treatment programme the boiler is now operating at a higher efficiency and has reduced the ongoing running costs due to continuous steam generation and no loss in production time.
Back to Case Studies